| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Camshaft, Renew | 4.2 | 0.0 | A | |
| Main Bearings, Renew | 1.6 | 0.0 | A | |
| Crankshaft, Renew | 4.5 | 0.0 | A | |
| Oil Pump, Renew | 1.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Rear Main Seal, Renew | 1.5 | 0.0 | A | |
| Timing Chain, Renew | 1.6 | 0.0 | A | |
| Valve Lifters, Renew | 2.6 | 0.0 | A | |
| One CYL |
| Right Bank | 12.2 | 8.7 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Left Bank | 13.6 | 9.7 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Both Banks | 18.8 | 13.4 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
| Note |
| To Grind Valves, Add | 3.5 | 2.5 | A | |
| With AC, Add | 0.5 | 0.3 | A | |
| With Manual Trans, Add | 0.5 | 0.3 | A | |
| All Cyls |
| Right Bank | 14.3 | 10.2 | A | |
| Left Bank | 15.7 | 11.2 | A | |
| Both Banks | 22.8 | 16.3 | A | |
| Note |
| With AC, Add | 0.5 | 0.3 | A | |
| To Grind Valves, Add | 3.5 | 2.5 | A | |
| With Manual Trans, Add | 0.5 | 0.3 | A | |