Curiosii for ever!: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank14.710.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank12.79.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks20.014.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With Folding Top, Add0.70.4A
To Grind Valves, Add3.82.7A
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Both Banks22.516.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Right Bank16.712.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank14.710.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearing, Renew1.50.0A
Crankshaft, Renew6.80.0A
Oil Pump, Renew0.90.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew
Manual Trans2.00.0A
Auto Trans1.50.0A
Timing Chain, Renew1.90.0A
Valve Lifters, Renew
Right Bank3.00.0A
Left Bank2.70.0A
Both Banks3.40.0A
Camshaft, Renew5.80.0A
Tune-Up0.80.0A