| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Note |
| To Grind Valves, Add |
| One Bank | 1.1 | 0.8 | A | |
| To Replace Main Bearings, Add | 1.4 | 1.0 | A | |
| One CYL |
| Right Bank | 12.7 | 9.2 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Left Bank | 12.7 | 8.9 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Both Banks | 16.7 | 12.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| All Cyls |
| Both Banks | 21.3 | 15.6 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Right Bank | 15.7 | 11.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Left Bank | 14.7 | 10.7 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.6 | 0.0 | A | |
| Timing Chain or Gears, Renew | 1.3 | 0.0 | A | |
| Oil Pump, Renew | 0.8 | 0.0 | A | |
| Tune Up | 0.9 | 0.0 | A | |