| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 16.4 | 11.7 | A | Includes: R&R Engine, Cylinder Head & Oil Pan, Hone Cylinder Walls & Plastigauge Bearings. |
| Auto Trans | 18.2 | 13.0 | A | Includes: R&R Engine, Cylinder Head & Oil Pan, Hone Cylinder Walls & Plastigauge Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs. |
| Main Bearings, Renew | 3.5 | 0.0 | A | Add The Following Operations If Performed Along With Piston & Ring, Renew |
| Crankshaft, Renew | 5.5 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump, Renew | 1.0 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine. |
| Timing Chain, Renew | 2.7 | 0.0 | A | Does Not Include: R&R Engine. |
| Tune-Up | 0.7 | 0.0 | A | Does Not Include: R&R Engine. |