Shift Interlock Switch: Testing and Inspection
Park Pin Switch Test
1. Remove the center console panel Center Console Panel Removal/Installation.
2. Disconnect the 6P connector (A) from the A/T shift lock solenoid/park pin switch/A/T gear position indicator panel light connector (B).
3. Check for continuity between terminals No. 1 and No. 2.
- There should be continuity when the shift lever is moved out of P.
- There should be no continuity when the shift lever is moved to P.
4. If the continuity is not as specified, replace the park pin switch Shift Lock Solenoid Test.